At CTI, we take immense pride in our unwavering commitment to delivering outstanding customer service and pioneering solutions. Our dedication to excellence is not just a mantra; it's ingrained in the very fabric of our business.
Primrgy - Gemini - Kiewit
Description
$1.2 Billion solar energy investment covering approximately 5000 acres
Problem
Tight schedule
Elevated basket for watershed with low clearance
Corrosive environment
Labor shortages
Elevated basket for watershed with low clearance
Corrosive environment
Labor shortages
Solutions
TOUGHGalv - Quick Turn
C2G Fittings - Removed weeks of cutting & splicing
Posi-Loks - Tooless snap in splice
Snap-On Covers - No loose hardware
C2G Fittings - Removed weeks of cutting & splicing
Posi-Loks - Tooless snap in splice
Snap-On Covers - No loose hardware
Samsung - Austin SCP- Yates
Description
$17 Billion semiconductor infrastructure investment focused on supporting tomorrows technologies
Problem
Tight schedule
Fixture Hanging Challenges
Simplicity of Installation
Fixture Hanging Challenges
Simplicity of Installation
Solutions
EG & SS - Quick Turn
Custom Solutions: Designed & delivered in 3 weeks
Custom Solutions: Designed & delivered in 3 weeks
Hersey - Liquids Plant - Guarantee
Description
Multi-Million dollar cutting edge liquid processing expansion faciltiy, covering over 177K square feet
Problem
Critical Path Schedule
Consistent Labor
Specialty Hanging Requirement
Design & Layout
Consistent Labor
Specialty Hanging Requirement
Design & Layout
Solutions
CTI Project Planning - Priority & consistent delivery
No Thread Rod - ETO vertical mount solution
Eng. Services - Full layout & installation package
No Thread Rod - ETO vertical mount solution
Eng. Services - Full layout & installation package
Panasonic - Battery Plant - Cupertino & Enerfab
Description
$4 Billion electric vehicle battery plant Investment targeting 30 GWh annual production capacity
Problem
Engineering & Design
Labor Shortages
Accessibility to Hanger Locations
Access to Wire Mangement Expertise
Labor Shortages
Accessibility to Hanger Locations
Access to Wire Mangement Expertise
Solutions
Engineering Services - Layout & Design
TOUGHLink - Intuitive & Accesible & Fast
TOUGHConnect - Continuous Attachment
CTI Team - Fast & Available to Assist
TOUGHLink - Intuitive & Accesible & Fast
TOUGHConnect - Continuous Attachment
CTI Team - Fast & Available to Assist
Leprino Foods - Dairy UG - Interstates
Description
$870 Million state-of-the-art dairy manufacturing facility with advanced re-gen electrification
Problem
Supply Chain Performance
Material Requirements
Washdown Requirements
Installation Methods
Material Requirements
Washdown Requirements
Installation Methods
Solutions
CTI - Reduced Lead Times & Project Planning
304 SS - Full TM System wash down capability
Custom Design - Better wash down capabilities
Eng. Services - GA drawings & installation details
304 SS - Full TM System wash down capability
Custom Design - Better wash down capabilities
Eng. Services - GA drawings & installation details